AKCP, the world's oldest and largest supplier of networked wired and wireless sensor solutions, has launched a free online PUE calculator to check your data center efficiency and identify potential savings.
DENVER - ColoradoDesk -- Power Usage Effectiveness (PUE) is a popular metric that measures how efficient your data center operation is. It's a ratio of the amount of energy spent on cooling vs the amount of energy spent on the IT load. A PUE of 1.0 means your data center runs on totally free cooling. A PUE of 2.0 means you spend an equal amount of energy on cooling as you do on IT load.
A well-designed and run data center can obtain a PUE of 1.2 - 1.3. However, most smaller edge data centers and in-house computer rooms have PUE numbers of 2.0 and above.
If you already know your approximate power consumption, you can enter your total facility loads and IT loads into the AKCP online PUE calculator. By adding your cost per kWh you can get an estimated annual energy bill for your data center. The example below shows how much it costs to run a 20kW data center with a PUE of 2.0
More on Colorado Desk
IT load = 20kW
Total facility Load = 40kW
PUE = 40/20 = 2.0
With a cost of $0.15 per kWh it would equate to an annual electrical cost of $52,560.
Now let's see what happens if we can improve our PUE to 1.5
IT load = 20kW
Total facility Load = 30kW
PUE = 30/20 = 1.5
With a cost of $0.15 per kWh it would equate to an annual electrical cost of $39,420
That equals a $91,980 annual saving!
Not only do you save operational overhead, but you lower the carbon footprint of the data center, which can open the possibility of government rebates and grants from green energy initiatives.
But how do you go about making these savings and implementing the changes in your data center that are required? AKCP has a wide range of sensors for your data center including cabinet thermal maps and differential air pressure sensors. These sensors allow you to make changes in your data center and with AKCPro Server see real time the effect it has on your PUE. You can ensure that your data center is running at optimal condition, without violating ASHRAE recommended rack inlet temperatures and ∆T as well as ∆P values.
More on Colorado Desk
AKCP wired and Wireless Tunnel monitoring system is available now. Contact sales@akcp.com for more details.
AKCP established in the USA in 1981, has 30+ years experience in professional sensor solutions. AKCP created the market for networked temperature, environmental, and power monitoring in the data center. Today with over 150 employees and 200,000 installations, AKCP is the world's oldest and largest manufacturer of networked wired and wireless sensor solutions.
https://intelli-tower.com
https://warehouse-tech.com
https://pharma-mon.com
https://hvactechblog.com
A well-designed and run data center can obtain a PUE of 1.2 - 1.3. However, most smaller edge data centers and in-house computer rooms have PUE numbers of 2.0 and above.
If you already know your approximate power consumption, you can enter your total facility loads and IT loads into the AKCP online PUE calculator. By adding your cost per kWh you can get an estimated annual energy bill for your data center. The example below shows how much it costs to run a 20kW data center with a PUE of 2.0
More on Colorado Desk
- Tuckwell Machinery Expands CNC Range to Support Australian Cabinet Makers
- The Inner Power of Emotional Self-Leadership
- Dr. Nadene Rose Shares the Secret to True Success: Faith, Obedience, and Divine Purpose
- Colorado: Governor Polis Signs Bills Into Law
- Understanding Unexpected Death: Why Independent Autopsies Matter in Cases Without Clear Cause
IT load = 20kW
Total facility Load = 40kW
PUE = 40/20 = 2.0
With a cost of $0.15 per kWh it would equate to an annual electrical cost of $52,560.
Now let's see what happens if we can improve our PUE to 1.5
IT load = 20kW
Total facility Load = 30kW
PUE = 30/20 = 1.5
With a cost of $0.15 per kWh it would equate to an annual electrical cost of $39,420
That equals a $91,980 annual saving!
Not only do you save operational overhead, but you lower the carbon footprint of the data center, which can open the possibility of government rebates and grants from green energy initiatives.
But how do you go about making these savings and implementing the changes in your data center that are required? AKCP has a wide range of sensors for your data center including cabinet thermal maps and differential air pressure sensors. These sensors allow you to make changes in your data center and with AKCPro Server see real time the effect it has on your PUE. You can ensure that your data center is running at optimal condition, without violating ASHRAE recommended rack inlet temperatures and ∆T as well as ∆P values.
More on Colorado Desk
- Governor Jared Polis Hands Out 3 Millionth Book with Colorado Department of Early Childhood Highlighting the Imagination Library of Colorado's Statewide Impact
- Epic Pictures Group Sets North American Release Date for the Thriller NO ORDINARY HEIST
- Boulder SEO Marketing Opens Louisville Satellite Office and Announces Local SEO Training with AI SEO Expert Chris Raulf
- Colorado: Governor Polis Celebrates Overall Population Increase, Population Increased in Counties with Most Housing Construction
- Award-Winning REALTOR® Paige Coker Joins Corcoran DeRonja Real Estate
AKCP wired and Wireless Tunnel monitoring system is available now. Contact sales@akcp.com for more details.
AKCP established in the USA in 1981, has 30+ years experience in professional sensor solutions. AKCP created the market for networked temperature, environmental, and power monitoring in the data center. Today with over 150 employees and 200,000 installations, AKCP is the world's oldest and largest manufacturer of networked wired and wireless sensor solutions.
https://intelli-tower.com
https://warehouse-tech.com
https://pharma-mon.com
https://hvactechblog.com
Source: AKCP
0 Comments
Latest on Colorado Desk
- Mysterious Box Discovered at State Capitol Opened by History Colorado, Governor Polis on Live TV
- Compliance Alert: Maryland, Texas Regulate Use of Artificial Intelligence in Utilization Reviews
- Colorado: Watch: Coloradans Share Their Favorite Train Names
- Colony Ridge Communities Celebrates Successful Soccer Season Kickoff with Families and Youth
- EFA Announces 2026 Editorial Rate Chart
- NYC Composer/Educator Launches Debut Children's Book to Fantastic Reviews
- Red5 Taps PubNub to Power the Next Era of Real-Time Interactive Streaming
- Shoutout Joseph Neibich aka Nybyk
- Meet Joseph Neibich aka Joseph Nybyk of Beachwood Canyon
- LARUS Launches Business Continuity Framework for IPv4-Dependent Networks
- KeysCaribbean Offers 'Skip-the-Crowds' Savings With 15 Percent Off April Stays
- Supply & Demand Chain Executive Names Puga Sankara as Recipient of 2026 Pros to Know Award
- AI Disruption Meets Marine Scale: Off The Hook YS, Inc. (N Y S E American: OTH) Targets Breakout Growth with NextBoat Launch and Aggressive Expansion
- Targeting the Billion-Dollar U.S. Countermeasure Market With AI-Driven Biodefense Platform: Lunai Bioworks (N A S D A Q: LNAI)
- New Global Standard for Transparency Across Critical Resources and Energy Markets: SMX (Security Matters) PLC (N A S D A Q: SMX)
- Forced Psychiatric Hospitalization Fails Vulnerable People: CCHR Urges Repeal Amid Rising U.S. Policies
- Surging Into High-Performance AI With $AMD Partnership, Patent Expansion, and Strengthened Balance Sheet: Avalon GloboCare Corp. (N A S D A Q: ALBT)
- Kiko Nation Launches Mobile App to Modernize Livestock Management and Digital Animal Registry
- NEW MANAGEMENT BOOK: Creating a Joy-Centric Culture
- QuickTrack by Datalex Transforms Retail Promoter Management with Claude AI and Real-Time Insights